2020 Tech Report Jan-Feb
This includes: • Respirator (Within Arm’s Reach) • Approved Employee Uniform (i.e. Long Sleeve Shirt / Long Pants) • Safety Toe Shoes or Boots • ARC Flash apparel (NFPA Requirement) • Other Personal Protective Equipment as outlined in the PPE Hazard Assessment • Other PPE as outlined by the facility. This may include a wide range of possible equipment, such as confined space entry equipment, retrieval harnesses, dust masks, etc.…
Tools and Materials: • Radio or Cell Phone Communications • StandardMechanic’s Tools • Means of Proper Evacuation and/or Dehydration • Ammonia Rated Gauges • Ammonia Rated Hoses • Ammonia Detector(s) Portable and/or Stationary • RefrigerationWrench • Standard Operating Procedure (SOP) for the operation of the equipment to which the strainer is attached. This is to be used in the event of the necessity of an Emergency Shutdown. • P&ID’s for all equipment to be worked on.
EQUIPMENT / MATERIALS REQUIRED:
Personal protective equipment (PPE) as outlined in the PPE Hazard Assessment for Refrigeration Operators / Technicians.
RETA TECHNICAL REPORT PAGE 2
Made with FlippingBook - Online Brochure Maker