2020 Tech Report May-June

• Other PPE as outlined by the facility. This may include a wide range of possible equipment, such as confined space entry equipment, retrieval harnesses, dust masks, etc… Tools and Materials: • Radio or Cell Phone Communications • StandardMechanic’s Tools • Transfer Hose (Ammonia Rated – See Transfer Hose Diagramon Page 3) • Pipe Plugs • A Barrel of Water • Standard Operating Procedure (SOP) for the operation of the equipment which will be tested. This is to be used in case of the necessity of an Emergency Shutdown. • P&ID’s for all equipment to be worked on.

EQUIPMENT / MATERIALS REQUIRED: Personal protective equipment (PPE) as outlined in the PPE Hazard Assessment for Refrigeration Service Technicians. This includes: • Full-Face Respirator – Immediately Available • Chemical Goggles with a Full-Face Shield • Chemical Resistant Apron • Chemical Resistant Gloves • Approved Employee Uniform (i.e. Long Sleeve Shirt / Long Pants) • Safety Toe Shoes or Boots • ARC Flash Apparel (NFPA Requirement)Other Personal Protective Equipment as outlined in the PPE Hazard Assessment

RETA TECHNICAL REPORT PAGE 2

Made with FlippingBook - professional solution for displaying marketing and sales documents online