2020 Tech Report May-June
Task # 4.: Concluding Float Switch Testing
STEP ACTION
COMMENT
1.
Restore allowable vehicular and pe- destrian traffic in your work area. Complete an entry in the facility Mas- ter Maintenance Log (or facility equiv- alent), noting the work performed. If a system upset occurred, record the details of the event in the Master Main- tenance Log (or facility equivalent). Note if the system was restored to full functionality, and if it was not, explain why in detail. Complete any permits or paperwork required. Return any facility owned documents, such as Standard Operating Proce- dures (SOP’s) and P&ID’s. If appropriate, debrief with your super- visor or facility contact: • Inform your contact of the sta- tus of the project. • Inform your contact of any is- sues which may require cor- rection. Remove PPE, clean, perform any re- quired preventive maintenance, and stow. Secure all tools and equipment uti- lized.
2.
If there is not an established Master Mainte- nance Log (or facility equivalent), log the infor- mation on your work order. This includes the shutting down of equipment or any instance where the system is not left in complete functioning condition.
3.
4.
5.
6.
7.
8.
RETA TECHNICAL REPORT PAGE 20
Made with FlippingBook - professional solution for displaying marketing and sales documents online