Maintenance Procedure Non-Standard Oil Draining

Page 20 of 20

3.d. Returning Alternate Configurations Not Listed Previously to Normal Operation STEP/ACTION COMMENT 15. Go to Task #4 “Concluding Non-Standard Oil Draining Procedure”.

4. Concluding non-standard oil draining procedure STEP/ACTION 1. Confirm that Task # 3.a. “Returning a Configuration “A” to Normal Operation”, Task #3.b. “Returning a Configuration “B” to Normal Operation”, Task #3.c. Returning a Configuration “C” to Normal Operation” and Task #3.d. “Returning Alternate Configurations Not Listed Previously to Normal Operation” has been completed. If not completed, do so now before continuing with this Maintenance Procedure. 2. Remove PPE, clean, perform any required preventative maintenance and stow. 3. Secure all tools and equipment utilized. 4. Verify waste oil storage container is stored appropriately. 5. Complete the work order and return it to the Plant Engineer.

COMMENT

See Plant Engineer for questions.

Note any comments in the “Comments” area.

Revision History

Revision

Date

Authorized By

Changes

Revision 1, November 1, 2023

This Copy Printed: November 1, 2023

MP-015 Non-Standard Oil Draining.doc Last Reviewed: October 30, 2023